Service Details:
Test Location | By Samples in Lab |
Temperature Testing Required | Yes |
Pressure Type | Hydraulic Pressure |
Testing Result Duration | Immediate Result Required |
Testing Type | Leak Testing |
Product Type | Vacuum |
Service Details:
Test Location | Customer Place |
Temperature Testing Required | Yes |
Pressure Type | Hydraulic Pressure |
Testing Result Duration | Within 2 hrs |
Testing Type | Proof Testing |
Product Type | Vacuum |
Service Details:
Minimum Order Quantity | 10000 Number |
Test Location | Customer Place |
Pressure Type | Transient Pressure |
Testing Result Duration | Immediate Result Required |
Testing Type | Proof Testing |
Product Type | Vacuum |
Mode | Offline |
A Negative Pressure Test Service can be carried out any stage of the good construction, but historically it is performed when the last production liner has been run and cemented in place. In recent applications, it is also performed after running in a lower completion to test the integrity of a fluid-loss control valve.
Service Details:
Minimum Order Quantity | 1000 Number |
Power Source | Hydraulic |
Material | Mild Steel |
Operating Mode | Automatic |
Application | Industrial |
Mode | Offline |